Job Description
FEDERAL REPUBLIC OF NIGERIA
ONDO STATE WATER CORPORATION (ODWC)
NIGERIA URBAN WATER SECTOR REFORM AND AKURE WATER SUPPLY AND
SANITATION PROJECT (NUWSR/AWSSP)
REQUEST FOR EXPRESSIONS OF INTEREST – FIRM SELECTION
Design Review and Construction Supervision of Akure Water Distribution Network
PROJECT ID: P-NG-E00-014
LOAN NO: 2000200005153 & 5050200001301
IFB NO: ODWC/UWSSP/AfDB/ P-NG-E00-014/CON/5/DED
The Federal Government of Nigeria has received financing from the African Development Bank towards
the cost of the Urban Water Sector Reform and Akure Water Supply and Sanitation Project being
implemented in Ondo State Water Corporations and intends to apply part of the agreed amount of this loan
to payments under a contract for Consultancy Services for Design Review and Construction Supervision
of Akure Water Distribution Network
The assignment involves review of Detailed Engineering Design of the existing design for Akure Water Distribution Network and Construction Supervision of Works. The Scope of the Services will involve the following:
a) Review and make recommendations concerning the existing design for the Pipeline distribution within Akure city and its environs.
b) Review the existing designs and/or prepare missing designs for network rehabilitation in accordance with FIDIC Red Book on construction norms and requirements for procurement of Works.
c) Supervision of the works contracts to ensure that the works comply with the approved design, drawings, specifications, conditions of contract and sound engineering practice.
d) Supervision of maintenance activities during the Defects Liability Period
The Assignment will be in two parts, thus, (i) review of the existing designs, drawings and specifications for
the pipeline distribution within Akure City and its environs within 6 months under a lump sum contract;
and (ii) supervision of the works contract for a contract duration of 18 months or the time estimated for the construction works under a time-based contract.
The Ondo State Water Corporation now invites eligible consulting firms to indicate their interest in
providing these services. Interested Consultants must provide information indicating that they are qualified
to perform the services (profiles, description of similar assignments, experience in similar conditions,
availability of appropriate skills among staff, etc.). Potential consultants may constitute joint ventures to
enhance their chances of qualification.
Eligibility criteria, establishment of the short-list and the selection procedure shall be in accordance with the
African Development Bank’s “Procurement Policy for Bank Group Funded Operations (October
2015), which is available on the Bank’s website at http://www.afdb.org.
Interested consultants may obtain further information at the address below during office hours 9:00am to
5:00pm Monday to Friday.
Expressions of Interest must be delivered to the addresses (email and office) below by 21 March 2024 at
11.00am and mention Design Review and Construction Supervision of Akure Water Distribution
Network. Soft copy of the expression of interest should also be submitted.
Attention: Project Coordinator (PIU)
Nigeria Urban Water Sector Reform and Akure Water Supply and Sanitation Project
Ondo State Water Corporation (ODWC)
Alagbaka GRA, Akure, Ondo State, Nigeria
Phone: +234 8035741505 or +2348039208342
E-mail: odwcpiu@gmail.com and copy ” engrremigiusogunjobi@gmail.com ; akinbinufelixo@gmail.com ; adebolaosatuyi2@gmail.com