NIGERIA LNG LIMITED (NLNG): INVITATION FOR EXPRESSION OF INTEREST (EOI) FOR CONTRACT FOR PROJECT IMPLEMENTATION, MAINTENANCE AND SUPPORT SERVICES FOR BACKUP UPGRADE

Application deadline date has been passed for this Job.
Expression of Interest
  • Post Date: November 13, 2023
Job Description

NIGERIA LNG LIMITED (NLNG)

INVITATION FOR EXPRESSION OF INTEREST (EOI) FOR CONTRACT FOR PROJECT IMPLEMENTATION, MAINTENANCE AND SUPPORT SERVICES FOR BACKUP UPGRADE

(1) INTRODUCTION

Nigeria LNG Limited (NLNG) seeks to upgrade/rejuvenate its current Backup Infrastructure to Quantum, Commvault Hyperscale and Metallic technologies to help remediate the asset integrity (obsolescence and vulnerability) at its end-of-life and support.

Nigeria LNG Limited hereby invites interested companies with the requisite experience detailed below to express their interest in participating in the bidding process.

(2) SCOPE OF WORK

The scope of this Expression of Interest (EOl) involves Project Implementation, Maintenance and Support Services to NLNG for its Backup Upgrade/Rejuvenation, including but not limited to the following:

(a)          Procurement of Hardware, Software and Licenses

(b)          Original Equipment Manufacturer (OEM) consultancy services, including project management and documentation, equipment delivery, power-up and integration, training sessions, workload migration, legacy equipment retirement, onsite residency, hardware maintenance and support

(2.1) Pre-Qualification

To qualify for consideration, interested companies must respond to this invitation with the following information/documents for consideration. Failure to submit any of the under-listed documents may lead to disqualification:

(a)          Respondents confirmation of interest to participate in the pre-qualification exercise for the Project Implementation, Maintenance and Support Services for Backup Upgrade

(b)          Certificate of Incorporation and CAC documents (forms CAC2 and CAC7)

(c)           Health Safety & Environment Policy and Quality Policy

(d)          Current/Valid relevant certificates to operate and to do business in the Nigerian oil and gas industry as issued by the Nigerian Midstream and Downstream Petroleum Regulatory Authority (“NMDPRA”), including the Midstream and Downstream Oil and Gas Industry Service Permit (MDOGISP)

(e)          Company profile, organisation, size, and structure, including any parent, technical partnership, alliance, or joint venture of companies to whom they belong, and a CV of the vendor’s management team.

(f)           A detailed list of relevant experience with evidence demonstrating capability and knowledge in performing similar works (for example, experience on Commvault and Quantum solutions with capabilities in backup, recovery, migration, hardware snapshot integration, cloud integration and flexible storage options). Kindly indicate clients’ names and contacts, location, and cost or volume of services provided with evidence.

(g)          Three (3) years of accounts audited by a licensed accountancy firm which shall be a member of a recognised institute of accountancy. Most recent accounts should not have an end-of-year date more than 18 months before the time of EOl.

(h)          Tax clearance certificates for the last three (3) years

(i)           Evidence and documentation supporting compliance with the Nigerian Oil and Gas Industry Content Development (NOGICD) Act 2010 (See Section 3: COMPLIANCE WITH NIGERIAN CONTENT (NOGICD ACT 2010).

Only companies considered to meet NLNG’s prequalification requirements shall receive further correspondence from the Company, including receipt of invitations to tender for the Backup Upgrade Project Implementation, Maintenance and Support Services.

(3) COMPLIANCE WITH NIGERIAN CONTENT (NOGICD ACT 2010)

The Nigerian Oil and Gas Industry Content Development (NOGICD) Act 2010 supports and details expected Nigerian Content deliverables within contracts and projects in the Nigerian Oil and Gas industry.

NLNG is committed to the NOGICD Act 2010 and Nigerian Content Development.

Interested companies shall comply with the provisions of the Nigerian Content Act that relate to the scope mentioned above and in particular, comply with the minimum Nigerian Content targets for the scope, which are covered in the Schedule of the Act.

Failure to comply with the Nigerian Content Act or demonstrate commitment to Nigerian Content  Development shall result in disqualification from this process.

(3.1) General Nigerian Content Requirements

Companies responding to this advertisement are required to submit the following in compliance with the NOGICD Act, 2010:

(a)          Develop a Nigerian Content Execution Plan (NCEP), which shall explain the methodology of how the contractor intends to comply with the requirements of The Act, how it intends to give first consideration to services provided from within Nigeria, how the tenderer would maximise the utilisation of Nigerian resources (labour, materials, and services) in the execution of this contract. Maximising Nigerian Content is a key Project priority.

(b)          Demonstrate that the entity is a Nigerian indigenous company, having more than 51% Nigerian equity shareholding in the registered entity. The tenderer shall submit certified true copies of CAC forms 10, 02 & 07

(c)           Tenderer should submit corporate organisational and project/contract specific organogram, listing names and nationalities of all personnel, but not limited to coordinator, supervisor, project manager etc., that will be involved in executing the work scope

(d)          Provide a detailed description of the location of in country committed facilities & infrastructure in Nigeria to support this contract

(e)          In line with the NCD Human Capacity Development Initiative, the tenderer shall commit to providing project-specific training, utilising OGTAN registered trainer(s) or other NCDMB approved institution(s).

(f)           The tenderer shall provide evidence of registration on the NCDMB NOGICJQS

(g)          The tenderer shall provide valid Category 1,2,3,4 or 5 for Consultancy Services (CS) and Procurement and Supplies (PS) Group NCEC demonstrating capacity and capability to execute work-scope

(h)          The tenderer shall provide a plan to ensure the utilisation of Nigerian banks, legal and insurance companies.

(4)  SUBMISSION OF RESPONSES

Submissions in response to the above shall be completed strictly in accordance with the instructions given in this publication, segregated, and arranged in the order indicated.

Failure to submit any of the documents requested herein may result in the disqualification of the company.

The expression of interest documents/requirements should be submitted in electronic copy in PDF format by e-mail to Backup.Upgrade@nlng.com with “CONFIDENTIAL – Expression of Interest: Contract for Project Implementation, Maintenance and Support Services for Backup Upgrade” in the subject line. Hardcopies shall not be accepted.

The submission must be received by NLNG on or before 1600hrs (GMT +1) Monday 4 December, 2023.

Please Note:

(a)          This is not an invitation to tender. A full tendering procedure will be provided to applicants who are successful at this expression of interest, in accordance with NLNG’s pre-qualification procedures.

(b)          Notwithstanding the submissions of the documents for the expression of interest, NLNG is neither committed nor obliged to include any company and/or associated companies, agents or sub-contractors on any bid list or award any form of contract to any company and/or associated companies, agents, or sub-contractors.

(c)           Please be aware that this invitation to express interest does not guarantee that you will be requested to submit an offer to Nigeria LNG Limited; it does not constitute any form of agreement or contract between our companies.

(d)          Nigeria LNG Limited shall not be responsible for any cost incurred in responding to this invitation.

(e)          This advertisement of Expression of Interest shall not be construed as a commitment by NLNG, nor shall it entitle respondents to claim any indemnity from NLNG, Technical Advisers and/or any of its shareholders by virtue of having responded to this advertisement.

(f)           This is a simple invitation for you to express your interest in the indicated work scope and does not warrant any further feedback from NLNG hereafter. If you do not hear from NLNG within 3months of submission of this publication, it should be taken that your application was not successful.

SIGNED:

MANAGEMENT

NIGERIA LNG LIMITED

.. a globally competitive LNG company helping to build a better Nigeria

ES/NCDMB/NLNG/ADV/MID/06112 3/lMPLf MENTATION, MAINTENANCE AND SUPPORT SERVICE FOR BACKUP UPGRADE PROJECT