JIGAWA STATE MINISTRY OF WORKS AND TRANSPORT: INVITATION FOR PRE-QUALIFICATION FOR ROADS CONSTRUCTION AND REHABILITATION

Application deadline date has been passed for this Job.
Invitation for Pre-Qualification
  • Post Date: May 24, 2024
Job Description

JIGAWA STATE GOVERNMENT

MINISTRY OF WORKS AND TRANSPORT

BLOCK B, Q4 NEW SECRETARIAT, P.M.B. 7023 DUTSE

REF: MOW&T/POL/S/CEN/150/1

INVITATION FOR PRE-QUALIFICATION FOR ROADS CONSTRUCTION AND REHABILITATION

In line with His Excellency Governor Umar Namadi’s 12 point Agenda among which is Urban Infrastructure and Rural Transformation. The Jigawa State Ministry of Works and Transport is hereby inviting interested reputable Civil Engineering Construction Companies to submit Prequalification documents for the following proposed roads Construction and Rehabilitation projects across the State:

(A)          Construction of Rural Feeder Roads

(1)          Chuwasu – Chakwaikwaiwa – Zangon Maje Feeder Road 25.8km

(2)          Kankare – Maiturumniya – Kanjau – Gangara – Garin Barka with Spur from Maiturumniya to Duhuwa Feeder Road 21.1km

(3)          Sada – Dankari – Unguwar Mallam-Kuda Feeder Road 13.5km

(4)          Kiri-Nahuce-Bardo-Sabongarin Takanebu Feeder Road 15.3km

(5)          Babban Sara-Malam Bako-Shabaru-Albasu Feeder Road 28.2km

(6)          Kwanar Gawo-Mawa- Kataudi – Ayan – Minari – Dawaya – Zugo – Kaigamari – Kaban – Une – Unik Gana – Mainawa -Hinge Feeder Road 28km

(7)          Gatare-Kazura-Abani Feeder Road 12.3km

(8)          Kiri Kassamma – Gayin – Kukadabo-Matafari-Dagilfani Feeder Road 15.5km

(9)          Andaza-Duhuwa-Katanga – Baranda Feeder Road, 17.5km

(10)        Tsakuwawa – Koya – K/Hausa Feeder Road, 30km

(11)        Maiduguri Road Along Alu Farm-Lemo-Janruwa-Kangire Road 10.5km

(12)        Abaya-Dagwaje-Atawame Feeder Road 13km

(13)        Gwaram-Sangara-Gadala-Malaji 6km

(14)        Kila-Jigawa-Sakuwa Feeder Road 8.1km

(15)        Kwanar Madobiya -Bagadaza- Zamandiri Road 9.5km

(B)          Dutse Capital Roads       15km

(C)          Township Roads in Urban Centers

(1)          Construction of Aujara Township Road 4km

(2)          Construction of Fagam Township Road 3km

(3)          Construction of Bulangu Township Road 3km

(4)          Construction of Gandun Sarki Township Road 3km

(5)          Construction of DansureTownship Road 3km

(6)          Construction of Sankara Township Road 3km

(7)          Construction of Roads Network in As-Salam University 3km

(D)          Upgrading Of Rural Feeder Roads

(1)          Construction of Kwanar Duzau- -Gwaron Maje Road 19.5km

(2)          Construction of Firji -Guntai – Buntusu – Dan’abzin Road 29.1km

(3)          Construction of SUBEB – Korau – Madobi – Shuwarin Road 18km

(4)          Construction of Kwanar Idanduna – Kadowawa – Gangawa- Nahuce Kwanar Olayinka Road 34.7km

(5)          Construction of Tarabu – Matarar Alhazai – Malanta – Sabon Garin Sawo-Sawo-Iyo-Gishinawo-Gafta Road 22.5km

(6)          Construction of Tage -Limawa – Makera – Mizan – S/Gida – Kwatalo Road 13.3km

(E)          New Construction of Regional Roads

(1)          Construction of Arbus – Girbobo – Gwalerima- Garin Bukar- Marma- Girte Gine-Kunderan Road 33.5km

(2)          Malam Madori – Gari Uku – Kanya Babba – Malorin Kasim – Garin Maigawo -Kubuna – Sumburtu – Diginsa Road 34.5km

(3)          Dundubus-Yanjaji- Wangara Road 15km

(4)          Jahun – Takalafiya – Zareku – Kafin Hausa with Spur from Takalafiya to Dangyatum Road 38km

(5)          Construction of Kukayasku – Malam Abba – Katuka – Garin Kwalandi Road 34.5km

(6)          Farun Daba – Maitsani – Baauzini – Kafin Chiroma – Gallu Babba – Gallu Karama – Karkarna Road 13.2km

(F)          Asphaltic Concrete Overlay

(1)          Hadejia-GarunGabas –Dolen Kwana Road 29.2km

(2)         Birnin Kudu – Sundumina – Kiyawa Road 47.4km

(3)          Gumel – Babura Road 45km

(4)          Gada-Farin Daba -Dandi-Achilafiya Road 28.5km

(5)          Rehabilitation of the sections Achilafiya – Dandi – Kanya Babba Road 74.2km

SCOPE OF WORKS:

The Scope of works includes but not limited to the following:

Clearance, Filling, Construction of Drainages, Culverts, Bridges, provision of 150mm lateritic sub-base and base course on carriageway and shoulder, surface dressing/asphaltic concrete overlay, and associated Road furniture.

MANDATORY REQUIREMENTS:

(1)          Certificate of Incorporation with Corporate Affairs Commission.

(2)          Certified true copy of memorandum and Article of Association;

(3)          Evidence of Registration with Jigawa State Due Process and Project Monitoring Bureau Works Registration.

(4)          Registration with Jigawa State Ministry of Commerce (Business Premises)

(5)          Tax Clearance for the last three (3) years.

(6)          Audited Account for the last one (1) year;

(7)          VAT Registration certificate and evidence of remittance(s);

(8)          Evidence of financial capability and Banking support;

(9)          Company average annual Turnover of not less than N250m for Category A, 500m for Category C and N2Billion for category B, D, E and F.

(10)        Evidence of similar project executed (letter of award and completion certificate) at least three (3) in the last five (5) years;

(11)        Company’s profile including names of key professional staff registered with relevant professional bodies;

(12)        That the companies have fulfilled all obligations to pay taxes, pensions and social security contributions;

(13)        A sworn affidavit certifying as follows:

(i)           That the document submitted for the pre-qualification exercises are not only genuine but correct

(ii)          That none of the directors of the company has been convicted by any court of law

(iii)         That the company is not bankrupt

(iv)         That none of the officers of Jigawa State/Local Government is a presently director of the company

(v)          Any other relevant information that will help in determining the company’s suitability for the work;

·         The Ministry reserves the right to accept or reject any application at any time without incurring any liability,

(i) This advert shall not be construed as commitment on the part of the Jigawa State Ministry of Works nor shall it entail a company to make any claim(s) whatsoever and /or to seek any indemnity by virtue of such company having responded to this advertisement.

Method of Submission:

The Prequalification documents have to be submitted on or before 12noon Monday, 10 June 2024 to the Director Procurement, Ministry of Works and Transport, Block B, New Secretariat Complex, Dutse.

Opening Time:

The Prequalification documents are to be open immediately after the closing of the submission by 12Noon at Ministry Conference Hall.

SIGNED:

SECRETARY MINISTERIAL TENDER BOARD

MINISTRY OF WORKS AND TRANSPORT, DUTSE